Page 2 of 2 FirstFirst 12
Results 14 to 15 of 15
  1. #14
    Join Date
    Jul 2010
    Location
    US of A
    Posts
    5,696
    Post Likes
    Quote Originally Posted by guchen View Post
    Thank you so much. it helps me a lot.
    Post a link to this thread when complete your project.
    Signature removed Violated rule #15

  2. Likes guchen liked this post.
  3. #15
    Join Date
    Jan 2020
    Posts
    7
    Post Likes
    Thread Starter
    Quote Originally Posted by pageyjim View Post
    Post a link to this thread when complete your project.
    Actually it's a marketing article. I have no idea whether it's proper to post the link here or not. But if u would like to read, I am glad to post my article link here: Refrigerated Vehicles Playing an Important Role in the Carriage of Global Medical Waste

Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Contracting Business
HPAC Engineering
EC&M
CONTRACTOR