Results 1 to 3 of 3
  1. #1
    Join Date
    Oct 2018
    Posts
    8
    Post Likes

    Question Delta DSC-1313 Schedule Point

    I've got a question about a schedule point in the DSC-1313. We have taken over a building and installed a JCI FX80 running 14.7, looking for a way to manipulate the schedule for this unit. I've attached the list of the properties of the point itself.

    Thanks,

    Ryan
    Attached Files Attached Files

  2. #2
    Join Date
    May 2009
    Location
    SC
    Posts
    2,187
    Post Likes
    Try moving your priority up. Some equipment already have something linked to those lower priorities and you get ignored with something as high as 12.

  3. #3
    Join Date
    Oct 2018
    Posts
    8
    Post Likes
    Thread Starter
    Quote Originally Posted by MaxBurn View Post
    Try moving your priority up. Some equipment already have something linked to those lower priorities and you get ignored with something as high as 12.
    I found that if I set Out Of Service to true, I can then do a regular override on the Present Value of the same point to 0 to set it unoccupied. My next step would be to see if it's possible to manipulate the schedule itself, and the exception schedule.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Contracting Business
HPAC Engineering
EC&M
CONTRACTOR