Results 1 to 5 of 5

Thread: Changeout

  1. #1
    Join Date
    Feb 2019
    Location
    Mississippi
    Posts
    26
    Post Likes

    Changeout

    What’s fastest you guys have done a change out?

  2. #2
    Join Date
    Oct 2014
    Location
    Saint Pail, Minnesota
    Posts
    601
    Post Likes
    Two hours on a cast iron boiler.

  3. #3
    Join Date
    Aug 2002
    Location
    Southold, NY
    Posts
    19,852
    Post Likes
    Wasn't aware we were in a race?

  4. #4
    Join Date
    Aug 2010
    Location
    Living rent free
    Posts
    6,024
    Post Likes
    Changed out a gas furnace in 55 minutes. An electric air handler in a mobile home coil and condenser in 1 hr and 45 minutes. A 5 ton heatpump in the attic, line set and cover, pad and condenser.. under 4 hrs..all with me and a 3rd year apprentice.

    Sent from my LG-K540 using Tapatalk
    "If you can’t describe what you are doing as a process, you don’t know what you are doing." ~ W. Edwards Deming

    All those who wander..are not lost.

    Do NOT..mistake my kindness for weakness.

    The early bird may get the worm..but the second mouse gets the cheese.

  5. #5
    Join Date
    Feb 2019
    Location
    Mississippi
    Posts
    26
    Post Likes
    Thread Starter
    😂

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.