Page 3 of 3 FirstFirst 123
Results 27 to 28 of 28

Thread: Nothing special

  1. #27
    Join Date
    Oct 2014
    Posts
    108
    Post Likes
    Thread Starter
    Quote Originally Posted by coharra88 View Post
    That's a good practice i see so many jobs with undersized return or just one return.It's best to have one in every bedroom if not ducted at least a transfer
    I see undersized duct at 90% of the houses I go to. I lose several change outs because I price them to add vents or increase the duct size. Its honestly impressive to see how tough some of the R22 systems are. They can have Zero airflow, under charged/over charged, with years of dirt and grass on the condenser coil and never check up. You only get the service call because its a few degrees off on the stat, when its 95 outside lol

    Point being Ive started going out of my way to insure our new high pressurized systems have as much air as they can get and that its balanced correctly.


    Sent from my iPhone using Tapatalk

  2. #28
    Join Date
    Sep 2007
    Location
    State College, PA
    Posts
    2,191
    Post Likes
    Quote Originally Posted by pecmsg View Post
    I've used 1 1/2" Electrical tape. UV Rated better looking then the cheap plastic with all the writing on it!

    Hate wire ties on armor flex
    Where do you get 1-1/2" electrical tape?
    Can someone please explain to me -
    Why is there never enough time to do it right the first time, but plenty of time to do it twice?


    Please view site rules: http://hvac-talk.com/vbb/showthread.php?t=1241

    Apply for Pro Membership: http://hvac-talk.com/vbb/showthread.php?t=116113

    Find your local HVAC-Talk Contractor: http://hvac-talk.com/aop

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.