-
Copeland digital scroll controller
I have a question about how the unloader solenoid is controlled. I am working on a dx dehumidification unit. THE units controller supply a 0-5vdc signal to copeland controller. I know below 1.4vdc compressor is to be off. I saw capacity control signal dropped by it didn't seem to correspond to unloaded. Maybe it's just the time delay built in.
-
 Originally Posted by hvac17011
I have a question about how the unloader solenoid is controlled. I am working on a dx dehumidification unit. THE units controller supply a 0-5vdc signal to copeland controller. I know below 1.4vdc compressor is to be off. I saw capacity control signal dropped by it didn't seem to correspond to unloaded. Maybe it's just the time delay built in.
I hope this helps:
https://climate.emerson.com/OPI/docu...A15Dae1328.pdf
-
That link does not seem to work.
Sent from my iPhone using Tapatalk
-
 Originally Posted by heatingman
That link does not seem to work.
Sent from my iPhone using Tapatalk
Try this: https://opi.emersonclimate.com/CPID/...AEB/ae1328.pdf
-
That one works
Sent from my iPhone using Tapatalk
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
|
Related Forums
The place where Electrical professionals meet.
|