Results 1 to 9 of 9

Thread: wwpd ?

  1. #1
    Join Date
    Sep 2001
    Location
    Seattle WA
    Posts
    38
    Post Likes

    wwpd ?

    What Would a Pro Do ? - High Efficiency Change Out in Middle Of Winter w/Snow on the Roof ?


    Dear friends,

    Please lend me your learned opinions. My furnace is dying - the furnace guy who was performing a tuneup showed me the "piccolo tubes" for the forced air furnace which no longer had holes - but were corroded into long slots - IE the burner is shot .. So it is new furnace time ..Problem is - it is a question between a high efficiency furnace and an 80% furnace that can use the existing 4" flue-pipe.

    It is the middle of winter and there is snow on the roof. The house is a 1 story rambler with a 2-12 low pitch roof with torch-down rolled roofing .. The furnace is located in the garage and the roof sheeting is literally 8 feet above the furnace - where the hole for the plastic pipe would be 6" from the roof crown/ridge. The furnace guy said he cant run the plastic out the sidewall of the garage because of the soffet vent that extends along the side of the house - extending across the garage and the attick crawl space above the homes living space. IE Didnt want to put the exhaust vent for the furnace near the attic vent - and the house has a 1 1/2 over hang which would trap the gasses or something ,,.

    QUESTION: The furnace guy said he was concerned about "breaching" a roof in the middle of winter because no adhesives or calks would cure unless it was atleast 40 degrees out. What do you think is prudent ? He said he could do a temporary vent seal thing as best he could - but coundlnt guarantee it until he could finish the seal job when things warm up. The problem is that this is torch down - a rolled asphalt product and not 3 tab - it is like poking a hole in a membrane - rather than tiered roofing . Any ideas would be appreciated - it is more for my expectations as to what I should expect given these facts ..

    On the other hand I could have him put in an 80& 2 stage & be done with it ,,. but he said the $$ of gas will rise & thus the value of the high efficiency .. regardless of the interveening hassle .. any ideas would be appreciated ! Regards,

  2. #2
    Join Date
    Jun 2007
    Location
    south carolina
    Posts
    176
    Post Likes
    Just do the 80% furnace. It will be more efficent then what you have with none of the problems. I would also consider doing a heat pump if you aren't already going that rought. The difference between the 80 and the 90 Isn't so astronomical especially when faced with all the obsticals.

  3. #3
    Join Date
    Mar 2005
    Location
    burlington county n.j.
    Posts
    9,881
    Post Likes
    is the furnace the only thing in the 4" b vent??

    he could TEMPORARILY run the pvc up thru the b vent then redo it after it warms up outside.....

  4. #4
    Join Date
    Sep 2002
    Location
    Northeast Ohio
    Posts
    4,890
    Post Likes
    On a temp basis, run a concentric vent out past the overhang. One way or another, I'd find a way to get a 95% in there.
    A good HVAC tech knows how, an educated HVAC tech knows why!

    DEM


  5. #5
    Join Date
    Jan 2004
    Location
    PA
    Posts
    80,602
    Post Likes
    As 527 said.
    Run the PVC throught the B vent if you don't have a water heater using it also.

    And a 90plus is worth the trouble.
    Unless you really think gas prices are going to be cheaper 10 years down the road.

  6. #6
    Join Date
    Sep 2002
    Location
    Northeast Ohio
    Posts
    4,890
    Post Likes
    Pick a sunny day, sweep off the roof and torch down a cone flashing. We do roof penetrations all winter, we're even better than the post office, although every once in a while some of my customers make me want to go postal............
    A good HVAC tech knows how, an educated HVAC tech knows why!

    DEM


  7. #7
    Join Date
    Jan 2008
    Location
    Outside The Motor City
    Posts
    671
    Post Likes
    A true "pro" can do it once in any condition,but it may cost more!

  8. #8
    Join Date
    Dec 2007
    Location
    Cedar Grove, Wi-Sheboygan
    Posts
    1,582
    Post Likes
    I would have to agree, if the guy who is doing the install knows what hes doing with regards to flashing a vent stack and has done a few weather or OD temps shouldn't make a difference. As far as putting in a 95% over a 80% is 15% in your pocket means your saving money, and no matter how you look at it 15% adds up tp a pretty good savings over time.

  9. #9
    Join Date
    Dec 2002
    Location
    Toledo, Ohio, United States
    Posts
    12,974
    Post Likes
    Twilli says the ? should be WWTD?
    No Heat No Cool You need Action Fast

Quick Reply Quick Reply

Register Now

Please enter the name by which you would like to log-in and be known on this site.

Please enter a password for your user account. Note that passwords are case-sensitive.

Please enter a valid email address for yourself.

Log-in

Posting Permissions

  • You may post new threads
  • You may post replies
  • You may not post attachments
  • You may not edit your posts
  •