Page 2 of 2 FirstFirst 12
Results 14 to 15 of 15
  1. #14
    Join Date
    Jan 2004
    Location
    PA
    Posts
    78,381
    Post Likes
    I don't believe in them myself.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  2. #15
    Join Date
    Sep 2002
    Posts
    27,186
    Post Likes
    Well; the better truth here is that forcing a DX system to do this envelope-pushing job is a little foolish to start with. For that kind of line run they'd be much better off with a chiller and water coils instead of evaporators.

    PHM
    ------




    Quote Originally Posted by lobsterbob View Post
    Thanks, looks like it more important to sell these guys on the fact that their risers are to big then sell them on a oil separator! Any thoughts on the Plasma Air units? I would think any reduction in run time is a reduction in risk? Plus they are heating with electric heat so this would calculate into about 8800.00 in utilities savings each year.
    PHM
    --------
    The conventional view serves to protect us from the painful job of thinking.

Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •