Page 2 of 2 FirstFirst 12
Results 14 to 15 of 15
  1. #14
    Join Date
    Jan 2011
    Posts
    42
    Post Likes
    Thank you..

    I have now 12*6 combustion register at bottom of door, I will add another one at the top.
    I also will add a return vent in the main space as you suggested.
    As for the gap between the registers and the duct, I will make the guy screw the nails all the way through the duct , so the drywall will be between the register and the duct tight. is this ok way to do it, does it matter if the drywall touches the duct.

    I appreciate your input very much.

  2. #15
    Join Date
    Aug 2007
    Location
    Northern VA 38 degrees N by 76 degrees W
    Posts
    5,063
    Post Likes
    Pictures would help. From the room it should be register.duct with flang turned outward around drywall and register screws through all three preferably into 2x4 stud.

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine