Results 1 to 4 of 4
  1. #1
    Join Date
    Jan 2005
    Location
    steeler nation
    Posts
    2,335
    Post Likes

    Google energy "Obvious Panel"

    I recently saw a spec on a job that requires the BAS to be tied into the tenants Google energy "Obvious Panel". We have the mechanical, the controls are specified to another contractor. I am curious if anyone has any info on the Google Obvious panel. I tried googling it but nothing came up.
    IV IV IX

    use your head for something other than a hat rack.......Gerry


    We have freedom because somebody fought for it.
    We keep it because we are willing to fight for it.
    We lose it because we are not willing to fight for it.

  2. #2
    Join Date
    Feb 2005
    Posts
    29
    Post Likes
    Try Obvius

  3. #3
    Join Date
    Apr 2007
    Location
    San Diego, CA
    Posts
    1,430
    Post Likes

  4. #4
    Join Date
    Jan 2005
    Location
    steeler nation
    Posts
    2,335
    Post Likes
    thanks digo.
    IV IV IX

    use your head for something other than a hat rack.......Gerry


    We have freedom because somebody fought for it.
    We keep it because we are willing to fight for it.
    We lose it because we are not willing to fight for it.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.
Comfortech 365