Results 1 to 20 of 20

Thread: You think its hairy now!!!

  1. #1
    Join Date
    Apr 2003
    Location
    Iowa
    Posts
    772
    Post Likes
    I've heard Trane is coming out with a 3 stage furnace, Carrier a constant burn system...
    Air conditioners with 25 SEER, A/C's with 30 SEER.
    Where will it end? Imagine your a/c bigger than your house. the cost as much as your house.
    an a-coil that weighs in at 600 lbs. LMAO...
    Seriously I have heard this. Tell me it isn't so...

  2. #2
    Join Date
    Apr 2003
    Location
    Iowa
    Posts
    772
    Post Likes
    Thread Starter
    for you serious types... no I didn't hear about one weighing 600 lbs.

  3. #3
    Join Date
    Jul 2002
    Location
    Zelienople, Pa
    Posts
    2,965
    Post Likes
    I've known about the 3 stage furnace for a couple months.

  4. #4
    Join Date
    Nov 2000
    Location
    Eastern PA
    Posts
    70,520
    Post Likes
    Why go three stage when the Rheem/Ruud modulating does so much more? You know damned well that installers are going to be connecting it to a single stage stat or the HO will install their own single stage.

    Lets hope it never ends. This is the stuff that keeps us in jobs.
    Training is important!
    Practical Training is a must!

  5. #5
    Join Date
    May 2000
    Location
    Indianapolis, IN, USA
    Posts
    42,886
    Post Likes
    The A-S/Trane 3 stage comes with a special version of the Vision Pro to handle 3 stages and communicate with the rest of the system. Their first attempt at a "real" control!

  6. #6
    Join Date
    May 2004
    Location
    Rapid City, SD
    Posts
    7,414
    Post Likes
    And it'll only take 3 wires to do it! I'm kinda excited about that part.

    I'm also excited about being forced to install the right stat with the unit. "Sometimes" (read all the time) we install single stage stats on 2 stage furnaces. I've preached and begged but no one listens to the kid ya know.

    I've heard they pushed back the 3 stage unit until this spring so they can actually test it before they release it... nice change!

  7. #7
    Join Date
    Jun 2005
    Posts
    178
    Post Likes
    installers are going to need heavy equipment to set the equipment and have to do major mods to install it.

  8. #8
    Join Date
    Feb 2005
    Posts
    344
    Post Likes

    A/S- Trane three stage

    Seven more stages and they'll catch up with RUUD.

    The Mod 90+ has been around since '98. One of Ruud's best kept secrets...

    Best regards

  9. #9
    Join Date
    Jan 2004
    Location
    PA
    Posts
    80,602
    Post Likes
    York's still working on their mod.

  10. #10
    Join Date
    May 2003
    Posts
    207
    Post Likes

    No thanks

    Can't wait to trouble shoot an intermittent control on an n-stage system!!

    Commercial control system trouble shooters will be waiting to charge 1800.00/day.


    Nice.

  11. #11
    Join Date
    Aug 2004
    Posts
    205
    Post Likes

    Re: No thanks

    Originally posted by noimposters
    Can't wait to trouble shoot an intermittent control on an n-stage system!!

    Commercial control system trouble shooters will be waiting to charge 1800.00/day.


    Nice.
    $2000.00

  12. #12
    Join Date
    Feb 2005
    Posts
    344
    Post Likes

    noimposters

    Don't be afraid...Just walk into the light.

    I can't vouch for the other brands, but the Ruud mod furnace is fairly easy to troubleshoot. Well, at least I think it is. Never really had to troubleshoot one. They are pretty realiable, you know.

    There are actually provisions on the board for troubleshooting the modulation function. The only difference as far a t'stat wiring is an extra wire which carries a signal for gas valve position.

    Infact, the baord on the mod 90+ has an 8 segment digital display for trouble codes.

    good luck ...


  13. #13
    Join Date
    Apr 2003
    Location
    Iowa
    Posts
    772
    Post Likes
    Thread Starter
    but its ruud to put in a rheem? or is it ya put in a ruud and ya get rheemed?

  14. #14
    Join Date
    Feb 2005
    Posts
    344
    Post Likes

    no bash...

    Never, I repeat, never buy anything with a blue oval on it:-).

  15. #15
    Join Date
    Feb 2005
    Location
    Richmond
    Posts
    482
    Post Likes

    Well I think...

    That all brands are good if they are installed and maintained correctly.

  16. #16
    Join Date
    Nov 2000
    Location
    Eastern PA
    Posts
    70,520
    Post Likes

    Re: no bash...

    Originally posted by ruud-man
    Never, I repeat, never buy anything with a blue oval on it:-).
    I'll only agree with this comment with Ford
    Training is important!
    Practical Training is a must!

  17. #17
    Join Date
    Nov 2000
    Location
    Eastern PA
    Posts
    70,520
    Post Likes
    Originally posted by beenthere
    York's still working on their mod.
    Yea! Like all of the other manufacturers are working their versions of it; "wait to see if Rheem/Ruud affects the market with theirs, then reverse engineer it."

    Really, it's just a modulating gas valve and a bunch of controls.
    Training is important!
    Practical Training is a must!

  18. #18
    Join Date
    Feb 2005
    Location
    Toms River, NJ
    Posts
    450
    Post Likes
    This ia an exciting time for our industry..with so many changes and advances. I welcome it because it will weed out the people who do not belong in this trade and then maybe we can make the kind of money we deserve.


    Dave in NJ

  19. #19
    Join Date
    Jun 2005
    Posts
    178
    Post Likes
    did a 410a 3 ton high eff two stage condenser and that thing was so big i thought it was the wrong unit it took 4 of us to get it off the truck and set it before long your going to have to go out and hire 3 or 4 guys for a couple of hours to help you set the equipment.

  20. #20
    Join Date
    Jan 2004
    Location
    PA
    Posts
    80,602
    Post Likes
    Originally posted by RoBoTeq
    Originally posted by beenthere
    York's still working on their mod.
    Yea! Like all of the other manufacturers are working their versions of it; "wait to see if Rheem/Ruud affects the market with theirs, then reverse engineer it."

    Really, it's just a modulating gas valve and a bunch of controls.
    One rep said late this winter they would release it.
    Then another said it might come out next winter, guess their having a problem.

Quick Reply Quick Reply

Register Now

Please enter the name by which you would like to log-in and be known on this site.

Please enter a password for your user account. Note that passwords are case-sensitive.

Please enter a valid email address for yourself.

Log-in

Posting Permissions

  • You may post new threads
  • You may post replies
  • You may not post attachments
  • You may not edit your posts
  •