Page 2 of 3 FirstFirst 123 LastLast
Results 14 to 26 of 27
  1. #14
    Join Date
    Oct 2009
    Location
    Nova Scotia, Canada
    Posts
    174
    I thought it looked good when I left.... haha just kidding

  2. #15
    Join Date
    Dec 2006
    Location
    Litchfield,Il
    Posts
    565
    You know, I always wonder if the actual installers/techs/business owners have been on here looking through the "Wall of Shame" files and says to himself......"That looks really familiar.......Oh Sh*t!"
    If your not getting the results you desire then change. People change from either desperation or inspiration.

  3. #16
    Join Date
    Apr 2007
    Location
    Greenville, SC
    Posts
    13
    After 35 yr. doing HVAC, what do installers say when issues like this come up? "Looks good from my house."

  4. #17
    Join Date
    Aug 2011
    Posts
    568
    me personally, the h/o was given options and this may have been the best option in his mind. over the years i've seen houses where i say, who's idea was this? the builder/ the architec, trying to hide units for aesthetic,, affects,the h/o on a budget as compared with opening up walls and the added expese of sheet rock,patch/paint,so when i see a picture like this,i factor in all the variables involved. but it isn't my house,and wasn't my choice.

  5. #18
    Join Date
    Nov 2004
    Location
    South Carolina
    Posts
    1,840
    i thinks they ran out of line set cover and didn't want to get anymore!!!!!!!! beer-thirty

    sad
    It is what it is unless I say differently !!!!

  6. #19
    Join Date
    Jun 2011
    Location
    Seattle WA
    Posts
    1,245
    Wow that has me cracking up, sorry to laugh. The good news is a real contractor can clean that up, unfortunately it will cost a few bucks. Normally I would say you could take all the money you saved by hiring such a contractor but it sounds like you paid for a Cadillac and got a Yugo... Its hard to decide on a contractor, you just never know what you are going to get. I always recommend going with a small to mid size company, and it helps to know who is actually going to do the work. I help on most of my company's installs, it gives the customer a warm fuzzy knowing that I will be on top of giving them a great installation.
    America; first we fight for our freedom,
    then we make laws to take it away.

    -Alfred E Newman

  7. #20
    Join Date
    Mar 2004
    Posts
    171
    Reviving this old thread, because the time has come to relocate the lineset off the outside wall.

    I have an "off the wall" question-pun intended. After much searching throughout the house, there are no good options such as closets or places to run the lineset up through the house. When the install was done, we had an option to place the unit on a flat roof, but the owner of the company rejected that idea.

    So here's my question--and please be gentle in your replies. We would run the lineset from the unit on the ground through the foundation and into the basement. We replaced our boiler and hot water heater with a high efficiency Weil McClain Unit this fall. So the line chimney flue is vacant. I went to the roof and checked it out. There is a separate terra cotta masonry fireplace flue separated from the old boiler flue and running parallel to it.

    One idea I am favoring is to run the lineset up through the unused chimney flue and cut a hole in the chimney in the attic and run it out through the side of the chimney. The unit is right next to the chimney, so it would be a clean run. I can assure you we would not vent anything through this lined flue as it is completely out of commission.

    Good or bad idea?

    I want to consider and eliminate this idea before I start with a professional and the option of moving the unit to the roof.

  8. #21
    Join Date
    Mar 2008
    Location
    kansas
    Posts
    145
    The worst part is someone thought this was a good idea
    Honeywell you can buy better but you cant pay more

    I told my wife when i die to sell my fishing stuff for what its worth not what i told her i paid for it

  9. #22
    Join Date
    Jul 2009
    Location
    Columbia, MD
    Posts
    4,470
    i dont see a problem doing this....people use the chimney to run their 3" pvc pipes for new high efficiency units.

  10. #23
    Join Date
    Dec 2007
    Location
    Afton, VA / Khorat, Thailand
    Posts
    2,469
    Not covering the last 2 feet really makes the whole job look shi..........er....poor.
    We use square plastic guttering alot, which looks like that, but covering the entire lineset makes a big difference.
    Tough times don't last...Tough people do.

    Midnight Sun Astrophotography

  11. #24
    Join Date
    Jan 2007
    Location
    Milwaukee Wisconsin
    Posts
    995
    Using the chimney as a "pipe chase" sounds feasable. Assuming that it is truly abandoned. It would really clean up this really ugly install.

  12. #25
    Join Date
    Jun 2002
    Location
    south jersey
    Posts
    1,131
    Good idea on the chimney. Have done this multiple times. You could even cap that portion of the chimney to keep it dry. Original install was a mess. Did you finish paying for this? When the owner/boss looked at this job he thought it looked ok? My boss would of made me redo that.
    You need to put the phone down and get back to work!

  13. #26
    Join Date
    Feb 2012
    Location
    central Florida
    Posts
    154
    Sounds good would the chimney need cleaned first

Page 2 of 3 FirstFirst 123 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event