Hi folks, Ive just a bout setteled on a furnace, or thought I did. I was pretty much sold on trane xl90 2 stage, contractor #3 tells me that 2 stage w/out variable speed will cost to much in elec. I am more confused than ever. All three are right on with size. One thinks return downflow of 8x20 could be enlarged to create more turns. Any help?