holy sheep mess....
your going to give them two quotes?
repair/ replace?
Thing needs to be striped and start from scratch if repairing.
my all time favorite -
first pic you are looking at two capacitors, a contactor, and the wad of duck tape that was used to hold it together in a ball and set inside the unit.
this is a single phase comp, and a three phase machine.
second pic empty copper straps and sealed equalizer tube where there once was a TXV.
third pic is some fancy pipe work
fourth pic is the disconnect - completely bypassed - what you can't see is the sealtight that has 10awg romex in it that Taps into the power disconnect of the rooftop beside it. (O>O)
what is even more amazing is that this thing actually ran just long enough to eject the terminal(pic5) and catch fire
The average person has one testicle, and one ovary.
holy sheep mess....
your going to give them two quotes?
repair/ replace?
Thing needs to be striped and start from scratch if repairing.
Step 1, take unit to edge of roof.
Step 2,..........
Step 3, replace with nice new unit, proper voltage, and phase.
Step 4, collect money!
Never give up; Never surrender!
Oh my Gawd! Somebody please call the cops. That thing is criminal and the guy who did it should be arrested for hackery!
But he had a GREAT PRICE! LOL
Make your expertise uniquely valuable.
Make your influence uniquely far-reaching.
That is absolutely awesome. Must be a well trained tech that could produce such a POS
I'm not tolerating Political Correctness anymore, from now on it's tell it like it is.
Veto Pro Pak - The best tool bag you'll ever own
Arrested for hackery, naa.
Misrepresentation of Qualifications-yes.
Atemted arson-yes.
And in the case of the disconnect-attemted murder.
Damn phosgene
Unbelievable,..... well,....not really,....here in Florida theres almost more "ac" guys than lawyers!
Somebody was working on a tight budget...
I think I agree with trouble time...Throw it off the roof...
But that was some of my best work! Very sad that somebody murders a unit that bad and that the facility let him
It's a wonder more hacks don't get killed in this business.
Sheepishly I have to admit I did not check the phase and voltage of a 5 ton heat pump until after the crane pulled away. The crane company picked the unit up at Lennox and that is where the mistake was made.
One of these days one of you guys is going to find that unit and post pics here. I ran 60 feet of flexible conduit across the roof to the closest source of single phase 240 voltage.
When the unit is replaced next time I will make amens.