Trane Duplex 2nd Stage
Results 1 to 2 of 2
  1. #1
    Join Date
    Jul 2010
    Posts
    40

    Trane Duplex 2nd Stage

    I am working on a Trane Duplex with an Adaptiview panel. Chiller model# CDHF3000. It appears that the 2nd stage circuit is stopped and started on something called "Chiller Control Signal". This is something calculated by the chiller.

    Does anyone know the defininition of "Chiller Control Signal" and how the chiller determines the "Chiller Control Signal Target"? I have looked in several manuals and haven't found anything yet.

  2. #2
    Join Date
    Oct 2009
    Location
    USA
    Posts
    48
    There are several start up options. I recommend you have your local Trane office come out and configure it the way you want.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event