Results 1 to 4 of 4
  1. #1
    Join Date
    Oct 2002
    Posts
    970
    Roofers are done and these splits took a ****-kickin'. 14 in all, 14 calls for cooling, 3 running. All were running previous to new roof...hmmm











    Those two pictured used to to sit "in series"..now sit "in parallel" Lotsa oil drips on the flares.

    Too much money to have us pump'em down and disconnect them beforehand, I guess.




    whoops, how'd that one get in there.

    [Edited by sonc on 08-11-2005 at 05:42 AM]
    I work with the Chiller Whisperer...

  2. #2
    Join Date
    Sep 2004
    Location
    Lancaster, Tx
    Posts
    183
    Originally posted by sonc




    whoops, how'd that one get in there.

    [Edited by sonc on 08-11-2005 at 05:42 AM]

    Nice - took a minute but gave me a good chuckle when it hit me
    If we didn't do this what would we do for fun?

  3. #3
    Join Date
    Jun 2004
    Location
    Florida
    Posts
    556
    Pride in his work my A$$ he couldn't even square the stamp with the box. No wonder he is packing fudge for a living.

  4. #4
    Join Date
    Jun 2005
    Posts
    347
    [QUOTE]Originally posted by lonestarheir
    [B][QUOTE]Originally posted by sonc
    [B]



    whoops, how'd that one get in there.


    for more info on fudgepacking goto. http://www.ebaumsworld.com/videos/fudgepacker.html

    [Edited by rasmussen6880 on 08-13-2005 at 01:01 PM]

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event