Results 14 to 17 of 17
Thread: STUDENT GOING CRAZY
-
06-05-2005, 01:49 PM #14
Regular Guest
- Join Date
- Sep 2004
- Posts
- 3,157
And you thought you were going crazy before-Ill bet you are going crazy and pissed off to ----now
sequence for the ac?
1) Damn its hot in here
2) turn the switch on and the set temp down
3) wait for chill
4) its still hot in here
5) turn the temp down to 68*
6) Still to hot in here
7) Go to the mall
-
06-05-2005, 05:08 PM #15
Professional Member*
- Join Date
- Nov 2004
- Location
- SW FL
- Posts
- 5,357
Creative Solutions
I am Definitely Creative enough to solve 3 problem at Once! !! It will just take 4 X Normal effort once you provide additional details.Originally posted by beenthere
Thanks for the advice. Can't back out, we do a fair amount of work for this GC. So its catch 22.
Designer Dan
It's Not Rocket Science, But It is SCIENCE with "Some Art".

Define the Building Envelope and Perform a Detailed Load Calc: It's ALL About Windows and Make-up Air Requirements. Know Your Equipment Capabilities
-
06-07-2005, 05:00 PM #16
Regular Guest
- Join Date
- Jun 2005
- Location
- NORTH CAROLINA
- Posts
- 2
THANKS BROTHERS FOR ALL THE VALUABLE INFORMATION ON HEATING AND COOLING SEQUENCE. I AM SORRY THAT I DID NOT INCLUDE IN MY ORIGINAL THREAD FOR BOOKS ,TAPES AND ARTICLES THAT ANYONE COULD SUGGEST TO HELP ME DURING MY STUDIES.
-
06-07-2005, 08:11 PM #17
Professional Member*
- Join Date
- Nov 2004
- Location
- SW FL
- Posts
- 5,357
Google ... ACCA and ... ASHRAEOriginally posted by bneet
I DID NOT INCLUDE IN MY ORIGINAL THREAD FOR BOOKS ,TAPES AND ARTICLES THAT ANYONE COULD SUGGEST TO HELP ME DURING MY STUDIES.
and you will have enough to read till 2047.Designer Dan
It's Not Rocket Science, But It is SCIENCE with "Some Art".

Define the Building Envelope and Perform a Detailed Load Calc: It's ALL About Windows and Make-up Air Requirements. Know Your Equipment Capabilities


Reply With Quote