Well it has been a while since I have updated the pics on the Buderus install that I was doing. Again this is a Buderus G115/34 with a Hydro-Air heat/cool air handler with a 40 gal Buderus indirect DHW. Keep in mind that the T&P overflows are not done as of the pictures, as well as the cold feed water overflow



These are very close quarters here. Not alot of head room of floor space




Air handler and DHW are using 1 inch type L copper and the two hydronic heat zones are using 3/4 in type L copper