    Sorry I didn't take pics of old furnace. Door is 2'6" and old furnace was 27" wide. took it apart in place until we could remove casing with nothing in it. Had to replace floor and level it too. . . .
    Be safe not fast. body parts don't grow back

  2. #2
    Join Date
    Dec 2002
    Location
    in a house, Appomattox, Va.
    Posts
    3,028
    Been there, done that. Hope the old one wasn't too sooty.
    Col 3:23


    questions asked, answers received, ignorance abated

  3. #3
    Join Date
    Jan 2002
    Location
    Ft.Worth,Tx
    Posts
    4,579
    Very nice closet job.. Nice straight lines,also like the hole through the ceiling for pvc vent(might get hot)...

    Nice job>>>(2) thumbs up^^
    "Everyday above ground, is a good day".
    "But everyday that you have made a difference in someones life, may insure you stay above ground a little longer".<aircooled>

  4. #4
    Join Date
    Mar 2003
    Location
    Washington,NJ
    Posts
    504
    Sweet Job, disregard any comments from Mr. Don't NoKnow it Alls, keep up the good work!!!!!

  5. #5
    Join Date
    Jul 2003
    Location
    South Carolina
    Posts
    49
    Nice looking job very clean and professional looking job. keep up the good work.

  6. #6
    Join Date
    Oct 2003
    Location
    Washington
    Posts
    7,405
    Looks pretty good, except I am pickier than most. First off, I can't stand seeing foil tape. Secondly, I always run BX cable for electrical, romex isn't protected enough, and thirdly, you should do the same with that T-stat wire. Some clamps for the wires and clear silicone for the gaps instead of tape would make it a perfect job.
    Josh

  7. #7
    Join Date
    Apr 2001
    Location
    Camel City, NC
    Posts
    6,225

    SH

    Thanks, but we are not allowed to use silicone. Have to use mastic tape or paint on to seal duct connections and pittsburgh. BX was added to elec. after pic was taken. Steel sleeve was added to gas pipe comming through floor and pvc sleeve to condensate drain so it can't be pushed down and break off at furnace. Metal under cooling coil is not required but my inspectors like it. Have 6 different ones to work with depending on where the job is in the county. AC piping and new condenser to be added in the spring.
    Be safe not fast. body parts don't grow back

  8. #8
    Join Date
    Sep 2003
    Posts
    1,311
    NEC prohibits running the romex to the furnace like that - it needs to be in some tyoe of conduit (flex, bx, mc, EMT, etc). The means of disconnect for the furnace (toggle switch) needs to also be close by; Mounted on the furnace is usually a good idea. The offset on the RA plenum is also choking the air. Not bad, though.

  9. #9
    Join Date
    Apr 2001
    Location
    Camel City, NC
    Posts
    6,225

    Duct offset

    I'll recheck my figures on that. It was 19x16 w/1.5" liner, 24" long and 7" offset. 1000cfm @ 650 fpm @.035 friction per 100' of duct. 60k furnace w/ 2.5 ac & 3.0 coil.
    Be safe not fast. body parts don't grow back

  10. #10
    Join Date
    Sep 2003
    Posts
    1,311
    I mean the offset itself. Measure from the sloped side across at a 90 degree angle (from the slope) and you will see that the duct size has reduced through the offset. Unfortunately, thanks to programmers that don't know about layout, I haven't seen a plasma table that doesn't do the same thing.

  11. #11
    Join Date
    Apr 2001
    Location
    Camel City, NC
    Posts
    6,225

    90º

    I thought that was what you were talking about. Using my figures I thought there was a little leeway. Yea I've seen the same on cutter layouts too.
    Be safe not fast. body parts don't grow back

  12. #12
    Join Date
    May 2003
    Location
    Dallas/Ft Worth, TX
    Posts
    439
    I just did a new Trane XR-80 install at a church and I took tons of pics but I'm not going to post them here and have every armchair HVAC installer tell me how crappy it looks. You did a good job and I'll bet the Homeowner is pleased which is all that matters. I wish I could do sheetmetal work like some of you guys.

  13. #13
    Join Date
    Sep 2001
    Location
    East Stroudsburg, PA
    Posts
    13,214
    Originally posted by sadlier
    NEC prohibits running the romex to the furnace like that - it needs to be in some tyoe of conduit (flex, bx, mc, EMT, etc).
    Please post the article and section of the 2002 NEC that you're interpreting.