Page 2 of 2 FirstFirst 12
Results 14 to 15 of 15

Thread: hvac 4.0

  1. #14
    Join Date
    Feb 2003
    Location
    Huntsville,AL
    Posts
    4,125
    I would urge the use of a disclaimer so that the calcs can be reviewed at the office! Or, just indicate the preliminary results, then review after 24h & send to HO. Anyone using a digital camera to show existing plenums?

    BTW, the house appraiser 4 yr ago was using a laser measuring device -- seemed to check with my tape measurements -- but, only room sizes (= longer measurements).

  2. #15
    Join Date
    Jan 2002
    Location
    tip of the mitt
    Posts
    1,974
    I've recently started using a digital camera. I'll get multiple shots of the job before and after. I've recently started to prefab all the boiler installs if space permits. This is a huge installation efficiancy boost. Pull the old boiler set the new one thats pre piped and prewired and make the connections.
    I have my own little world. But it's OK...they know me here.

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event