This was one of the tightest duct jobs I have ever done. Going back tomorrow to finish. I hope the return air works out 16+12 sq to 12+12 radius 90 and a 16+12 to 16+10 transition to install. 30,000 btu cooling. Any comments, suggestions welcome.