Results 1 to 2 of 2

Thread: Site Prep

  1. #1
    Join Date
    May 2009
    Location
    SE PA
    Posts
    1

    Site Prep

    I'm scheduled to have a new Carrier system (2 HP's and furnace) installed starting on Tuesday. The units will be installed on 3 inch pads set directly on the ground. Besides getting the area leveled off and probably putting landscape fabric down, should I put down a stone base or do any other prep?

    Looking forward to some cool air!

    Thanks.

  2. #2
    Join Date
    Nov 2000
    Location
    Upstate, SC
    Posts
    2,920
    I'd leave that up to you. The pads at my house sit directly on the ground, but it wouldn't hurt anything to level out the area and put down something.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event