I am staying busy here too! I get between 45-55 hrs a week. But it helps when you drop down to 2 service techs due to attrition!
Had a heck of a day with LP systems. Got sent out to check the pins and gas pressure on an LP trane furnace. Did it... verified low and high fire. Left... went to work on a boiler down fir a week due to a bad recirc pump. Did the pump last night. COuldnt get the boiler to stay lighted.... (notice I said lighted and not lit!?!?! ) anyhoot.... in the middle.... got called to run back to the furnace job.... they smelled propane. They shut the cutoff valve inside the building. (I just knew I hadnt screwed anything up) ,,,, broke out the soap bubbles... no leaks on any connections the guys did. Saw some rust on existing pipe.... VIOLA! Originally someone had put pvc over the pie... and around those edges.,... there was rust.... and a leak. Boss was coming with parts.... took it all apart..... had to beat the old pipe through the wall due to the swelling of the rust. That piece fell to the floor and knocked the rust off. Underneath was a hole about 1/4 inch around!!! LOL... Like they had saved the building? NOT. Damn glad I found that leak, woulda been a lot warmer in DUCK today if that building went up