Page 2 of 2 FirstFirst 12
Results 14 to 15 of 15
  1. #14
    Join Date
    Jun 2017
    Location
    Md
    Posts
    27
    Post Likes
    All in a day!?! That's 2 weeks faster than I'd even think about doing one!


    Sent from my iPhone using Tapatalk

  2. #15
    Join Date
    Aug 2009
    Location
    Prattville, Alabama
    Posts
    3,154
    Post Likes
    Quote Originally Posted by Nessy View Post
    All in a day!?! That's 2 weeks faster than I'd even think about doing one!


    Sent from my iPhone using Tapatalk
    I'm pretty sure he means that was to get the motor on the floor, lol.
    Reassembly does take a lot longer.

  3. Likes CHILLERSVCMAN liked this post
Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.