Here I was changing out some overload relays. Nothing major, but I stopped and got a few pictures of some stuff. This was a design-build project. The building is LEED certified and has an Automated Logic BacNet control system. These units are 407c, also...

Enjoy









And some pictures of ductwork and VAVs downstairs.