    Long Island's Nuke Plant

    Lipa tells you to conserve electric use,and now they want a rate hike.they still are billing customers on the shutdown of the plant in 89' that is owed at $3.3 billion dollars to date.....and they are now buying Oswego Nuke generated electric from upstate New York plant.hope the protesters who shut it down enjoy paying that bill.to all those National Grid customers with gas bills watch those meter readings numbers......they are adding to the readings with estimated billing. 800 acres and they can't figure out what to do with it.....indoor mall...gas powered generating plant with gas line from CT...movie theaters....touriest attraction
    "when in doubt...jump it out" http://www.youtube.com/watch?v=Px5YcOeQB4I

  2. #2
    Join Date
    Dec 2006
    Posts
    280
    hell i say leave it like it is and turn it into a big scenario paintball field

  3. #3
    Join Date
    Dec 2005
    Location
    Rockhill South Carolina
    Posts
    370
    It will be just like that til the end of time

  4. #4
    Join Date
    Jul 2001
    Location
    Gold Coast of Connecticut
    Posts
    4,543
    From what i understand that plant could be turned on if we have oil issues.

    I do not understand what the fuss was about. It was run at low power for a few months then shut down.
    Aire Serv of SW Connecticut- Gas heat, dual fuel and central a/c systems installed and serviced

  5. #5
    Join Date
    Aug 2002
    Location
    Southold.calm
    Posts
    4,855
    LIPA / LICO same s@it / different year

  6. #6
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    66,786
    Quote Originally Posted by Freezeking2000 View Post
    From what i understand that plant could be turned on if we have oil issues.

    I do not understand what the fuss was about. It was run at low power for a few months then shut down.

    But turning it on would make too much sense.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  7. #7
    Join Date
    Dec 2006
    Posts
    280
    Quote Originally Posted by beenthere View Post
    But turning it on would make too much sense.
    from my experience living here, theres alot of things, and even more people that dont make sense on long island

  8. #8
    Join Date
    Jul 2001
    Location
    Gold Coast of Connecticut
    Posts
    4,543
    Quote Originally Posted by artman934 View Post
    from my experience living here, theres alot of things, and even more people that dont make sense on long island
    I never understood why it was not turned on. I believe the lobby against the nuke plant overwhelmed common sense. Nukes have been very safe and this plant i believe to be the newest in the counry.

    You can see it from CT.
    Aire Serv of SW Connecticut- Gas heat, dual fuel and central a/c systems installed and serviced

  9. #9
    Join Date
    Oct 2001
    Posts
    6,855
    National Grid bought up Keyspan and all those out of date plants to produce electric that need upgrades bigtime.i always wondered how they snuck that fuel out of the plant,and off the Island.maybe on a barg in the Sound ,and to the Indian Point plant up on the Hudson?
    "when in doubt...jump it out" http://www.youtube.com/watch?v=Px5YcOeQB4I

  10. #10
    Join Date
    Jan 2001
    Location
    Pamnyra VA.
    Posts
    709
    i thought they couldn't evacuate the island if it came to it.

  11. #11
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    66,786
    Quote Originally Posted by skibme View Post
    i thought they couldn't evacuate the island if it came to it.
    When 3 mile island was in trouble(getting ready to go critical), they didn't evacuate the area.

    By the time they would sound an evacuation alarm, till the time a plant blew up, they're wouldn't be enough time for people to get a safe distance.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  12. #12
    Join Date
    Oct 2001
    Posts
    6,855
    50% of the residence out there have never drivin on the LIE(the worlds largest parking lot)unless the grapes out at the North Fork wineries started glowing they're not movin.they should of left it running at low power all these years,and they could of updated its saftey systems as a result of TMI
    "when in doubt...jump it out" http://www.youtube.com/watch?v=Px5YcOeQB4I

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event