Page 3 of 3 FirstFirst 123
Results 27 to 28 of 28
  1. #27
    Join Date
    Jan 2004
    Post Likes
    I have a couple that sya 3, and I have 2 that say 5.
    Atleast one of the ones that says 5 is from 4 seasons training.
    A rep from some place gave me several of them.
    Contractor locator map


    How many times must one fix something before it is fixed?

  2. #28
    Join Date
    Aug 2008
    Rockport, Texas
    Post Likes
    I've run across several units in the last few days with too small Frags and overcharged. Everything worked fine until something changed or went wrong. I always check airflow first.

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.
Quality Home Comfort Awards