Page 2 of 2 FirstFirst 12
Results 14 to 16 of 16
  1. #14
    Join Date
    Feb 2004
    Posts
    2,597
    What did Manual J call for after renovations?

  2. #15
    The original installer was also the one who done the upgrade. He thought the unit was sized enough with the additional 480sq. ft. addon. I'm not sure if I want to go to the expense of putting in a new system when we may not even be living here in the next 2 or 3 years. I heard that a new regulation was going into effect in 2009 and was told it would be better to wait until then if I decided to replace it. Not sure what the new regulation was though.

  3. #16
    Join Date
    Jan 2004
    Location
    PA
    Posts
    68,752
    They probably ment 2010, for No new units being made using Virgin R22.

    You can get a new unit today using teh R410A refrigerant, you don't have to wait.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event