Page 2 of 2 FirstFirst 12
Results 14 to 18 of 18
  1. #14
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    62,165
    Just checked. I sent it on the 4th.
    Contractor locator map

    How many times must one fix something before it is fixed?

  2. #15
    Join Date
    Apr 2007
    Posts
    6,286
    Quote Originally Posted by beenthere View Post
    Just checked. I sent it on the 4th.
    Sorry not trying to be annoying.....Do you remember the name of the file...maybe I put it in my storage and mean to go back and go over it and forgot. I don't doubt I would have saved it....been about a case of beer thrown in theirbecause of the whole fourth (looks around with a kinda guilty look)


    Thanks heatingairman for the Lennox line set guidelines.

  3. #16
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    62,165
    LMAO.

    You won't believe the topic.

    Its called.
    Line set sizing.
    Contractor locator map

    How many times must one fix something before it is fixed?

  4. #17
    Join Date
    Apr 2007
    Posts
    6,286
    Okay I found it sorry

  5. #18
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    62,165
    Goes into pressure drop/increase for vertical lines.
    Not too deep.
    Also piston size increase/decrease for excess vertical heigth.
    Contractor locator map

    How many times must one fix something before it is fixed?

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •