Page 2 of 2 FirstFirst 12
Results 14 to 18 of 18
  1. #14
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    67,760
    Just checked. I sent it on the 4th.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  2. #15
    Join Date
    Apr 2007
    Posts
    6,285
    Quote Originally Posted by beenthere View Post
    Just checked. I sent it on the 4th.
    Sorry not trying to be annoying.....Do you remember the name of the file...maybe I put it in my storage and mean to go back and go over it and forgot. I don't doubt I would have saved it....been about a case of beer thrown in theirbecause of the whole fourth (looks around with a kinda guilty look)


    Thanks heatingairman for the Lennox line set guidelines.

  3. #16
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    67,760
    LMAO.

    You won't believe the topic.

    Its called.
    Line set sizing.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  4. #17
    Join Date
    Apr 2007
    Posts
    6,285
    Okay I found it sorry

  5. #18
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    67,760
    Goes into pressure drop/increase for vertical lines.
    Not too deep.
    Also piston size increase/decrease for excess vertical heigth.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event