-
Project builder will not save
Project BuildeI uploads an N-31 rt
I hit save as to save the data base
Edit and re arrange the n-31 points
Before I close it I hit save .
I go to open up the data base and all the changes are gone?
Thank You
-
I have a UNT controller
I am attempting to re order the devices in the UNT's object list
I want to place more important objects setpoints,temperatures etc.
towards the top of the list
I select an object
hit CUT
and PASTE it into the UNT
I re order the list the way we want it
I save the project , Download it
But When we open it in ProComm the list is in the original order.
Do I have to insert a new UNT
and copy and paste the points in the order I want it .
into the new UNT ?
I gather there is no drag and drop feature for each object?
Thank You
-
Project Builder organizes objects alphabetically. If you want objects in a specific order to view through hyperterminal, then make a group and you can organize objects any way you want.
-
After I add a group or a container,
Project Builder does not allow me to add controller
input/ output points (AO,AI,BO etc.) to a group or container.
It appears that I will have to remove all the points using the VT-100
and then add them back in the order we want.
Is there a way to cut and paste them using ProComm Plus?
Thank You
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
|
Related Forums
The place where Electrical professionals meet.
|