Results 1 to 2 of 2
  1. #1
    Join Date
    Apr 2001
    Location
    Riverside CA
    Posts
    64

    Carrier 3V Load shedding

    Is it possible to set up load shedding in 3V if so how and where can I find the info on it?

  2. #2
    Join Date
    Mar 2007
    Location
    Melbourne,Aus
    Posts
    346
    The 3V system can be loadshed the same as any CCN system, a loadshed module is required on the network and the Premierlinks controlling the units have to be setup for loadshedding. See the attached, the complete manual was too big to upload.

    Aus..
    Attached Images Attached Images
    Attached Files Attached Files

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event