Page 2 of 2 FirstFirst 12
Results 14 to 15 of 15
  1. #14
    Join Date
    Jan 2004
    Location
    PA
    Posts
    69,804
    Post Likes
    Grossly under sized duct work will take out a VS blower on a regular basis.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  2. #15
    Join Date
    Jul 2006
    Location
    Virginia
    Posts
    5,182
    Post Likes
    wonder if its wired correctly some installers/techs think you can bypass the board with y or they hook it to y1 and only get 50% airflow .

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.
Comfortech365 Virtual Event