I am bidding a high velocity job. The previous contractor was let go and we were referred to finish installing the handler and condenser. The owner has 1700 ft^2. Two 7" round pipes; one feeds the 2nd floor with 13 outlets and the other feeding the 3rd floor with 6 outlets.

Is there any possible way to zone this system or install two units?