Page 2 of 2 FirstFirst 12
Results 14 to 16 of 16
  1. #14
    Join Date
    Aug 2012
    Posts
    2,645
    Just hold one end with one hand and connect with the other wahlaa.
    My name is TooCoolforschool and I am a chronic over charger.

  2. #15
    Join Date
    Mar 2013
    Location
    Joplin,Missouri
    Posts
    310
    Quote Originally Posted by BaldLoonie View Post
    Letting the board time up is a poor excuse for comfort. A smart tech could handle a wire that needs to be extended 2"
    agreed

  3. #16
    Join Date
    Dec 2010
    Location
    Woodbridge Twp, NJ
    Posts
    1,307
    Quote Originally Posted by cjpwalker View Post
    EL = Elite line, 2 = two stage, 96 = afue, V = variable speed blower
    Thanks! I don't deal with enough Lennox's to know the nomenclature.
    Every customer you take for granted today will be someone else's tomorrow.

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event