Page 2 of 2 FirstFirst 12
Results 14 to 16 of 16
  1. #14
    Join Date
    Aug 2012
    Posts
    2,908
    Post Likes
    Just hold one end with one hand and connect with the other wahlaa.
    It's not if your doing it right it's whether your doing the right thing that is important.

  2. #15
    Join Date
    Mar 2013
    Location
    Joplin,Missouri
    Posts
    310
    Post Likes
    Quote Originally Posted by BaldLoonie View Post
    Letting the board time up is a poor excuse for comfort. A smart tech could handle a wire that needs to be extended 2"
    agreed

  3. #16
    Join Date
    Dec 2010
    Location
    Woodbridge Twp, NJ
    Posts
    1,309
    Post Likes
    Quote Originally Posted by cjpwalker View Post
    EL = Elite line, 2 = two stage, 96 = afue, V = variable speed blower
    Thanks! I don't deal with enough Lennox's to know the nomenclature.
    Every customer you take for granted today will be someone else's tomorrow.

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.
Comfortech365 Virtual Event