    36'' chilled water pipes??

    http://www.burjdubaiskyscraper.com/f...opic.php?t=122




    The tower will nevertheless require about 10,000 tonnes of cooling per hour, where one tonne of cooling is 12,000 times the
    amount of heat that will raise or lower the temperature of one pound of water by one degree Fahrenheit.
    Water that has condensed on the building from the air outside will be collected and used to water the surrounding
    landscape.
    "It's so humid here in Dubai so the cooling system captures a huge amount of water," said structural engineer William
    Baker.
    Condensed water will be collected and piped to a holding tank in the basement car park, from where it will be pumped into
    the landscaping system.
    About 15 million gallons of water will be supplied each year this way - the equivalent of 20 Olympic-sized swimming pool

    Water pipes 36 inches in diameter will carry chilled water high up into the Burj Dubai for use in the building's cooling
    systems.
    Water used for fire protection sprinklers and hydrants, and for tap water, is pumped up and held in tanks. Gravity then
    produces the flow when water is used.
    Power supply
    Architect Eric Tomich said "very large" electrical cables will supply power through the tower, which will have its own
    electrical substations.




    I wonder what size pump is needed for that??
    Attached Images Attached Images  
    5 out of 4 people don't understand fractions

  2. #2
    Join Date
    Jan 2003
    Location
    USA
    Posts
    1,670
    36" I would love to see how they support something like that. Surly it cannot go 100+ stories straight up. Must be an impressive pumping system, and a farm of chillers.

    >Architect Eric Tomich said "very large" electrical cables will supply power through the tower, which will have its own
    electrical substations.

    Piece of cake. HV mains to a substation every 5-10 floors, they do it in cities everywhere. The cables would not be that large. Telco and Data would be lots of fiber backbone I would think. But 36" pipes full of water.....that’s heavy & large!

  3. #3
    Join Date
    Aug 2000
    Location
    USA
    Posts
    4,990
    I toured a 15,000 HP ammonia plant under downtown Chicago, I think they had 60" CW lines going out of that plant. It was for the CW loop around the city.

  4. #4
    Join Date
    Feb 2006
    Posts
    224
    i have seen 60" tower water return running horizontally across plant room floor, feeding into 8 1100 ton centravacs, but never saw anything that size going vertical.
    absbertek, was that the com edison plant near michigan avenue, i think in a blue cross blue shield building?

  5. #5
    Join Date
    Jan 2007
    Location
    fort myers,FL
    Posts
    28

    48'' pipe vertical

    At a chiller plant we are replacing three chillers they have 48" pipe going vertical 15 floors it's not uncommon just not that well known . I mentioned this thread to a co worker apparently in cinn, OH the have a company that supplies chilled water to downtown in 60in pipe horiz..

    http://www.de-gs.com/projects/distri...trict_cool.asp

  6. #6
    Join Date
    Jan 2003
    Location
    USA
    Posts
    1,670
    How do they support it vertically and handle the expansion?? I have seen lines horizontal that large but never vertical, especially at those kinds of distances.

  7. #7
    Join Date
    Dec 2003
    Location
    Location!, Location!
    Posts
    929
    Quote Originally Posted by bertoh View Post
    i have seen 60" tower water return running horizontally across plant room floor, feeding into 8 1100 ton centravacs, but never saw anything that size going vertical.
    absbertek, was that the com edison plant near michigan avenue, i think in a blue cross blue shield building?

    I think the loop supply is the building at NE corner of Congress(IKE) and the river, right by Wells and Wacker.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event