    So I made the ultimate rookie mistake today

    Doing a compressor/heat exchanger change out on a -87 ultra low today, warrenty job for Thermo Fisher, everything changed out yesterday, tripple evac and on the pump over night. Both stages holding under 500, charge stage 2 with1oz propane and 13oz 508b, ok, charge stage 1 with 21oz 404a..ok, go to startup and comp runs for 5 sec and trips breaker....wtf recheck all my wiring, start electrics, etc (all new obviosly) all is good... wtf, look at comp nameplate Arrrrrgggggg 115v comp in 208 unit.. bastards sent the wrong one and I didnt catch it... in my defence the packing slip said 208v compressor.....oh well all billable to thermo fisher under warrenty... lesson learned though bah

  2. #2
    Join Date
    Jan 2009
    Location
    Salisbury, Maryland
    Posts
    143
    Ahhh that sucks man but it happens haha Just like installing a 3 phase package unit when your present voltage 240 single phase

  3. #3
    Join Date
    Oct 2005
    Location
    B.C. Canada
    Posts
    888
    First time for me in over 10yrs in this damn trade..lol oh well

  4. #4
    Join Date
    Oct 2011
    Location
    Chicagoland Area
    Posts
    4,681
    Officially, Down for the count

    YOU HAVE TO GET OFF YOUR ASS TO GET ON YOUR FEET

    I know enough to know, I don't know enough
    Liberalism-Ideas so good they mandate them

  5. #5
    Join Date
    Dec 2008
    Location
    NW Iowa
    Posts
    125
    Been there, had that.

  6. #6
    Join Date
    Dec 2012
    Location
    columbus, OH
    Posts
    2,072
    Hows that motor doing? I put put a light bulb on 240v its was very bright.

  7. #7
    Join Date
    Oct 2005
    Location
    B.C. Canada
    Posts
    888
    She spun really fast.....

  8. #8
    Join Date
    Oct 2005
    Location
    B.C. Canada
    Posts
    888
    Quote Originally Posted by 2sac View Post
    Yup...oops

  9. #9
    Join Date
    May 2012
    Location
    Upper Michigan
    Posts
    3,589
    I put a recovery machine on 220, shut it off before it **** out but It blew some smoke!

  10. #10
    Join Date
    Oct 2005
    Location
    B.C. Canada
    Posts
    888
    Quote Originally Posted by Joehvac25 View Post
    I put a recovery machine on 220, shut it off before it **** out but It blew some smoke!
    Sweet, that should cut recovery time in half...lol, I love this trade :-S

  11. #11
    Join Date
    Oct 2005
    Location
    B.C. Canada
    Posts
    888
    Over 10 years and I still cant win...

  12. #12
    Join Date
    May 2012
    Location
    Upper Michigan
    Posts
    3,589
    Quote Originally Posted by coolerik View Post
    Sweet, that should cut recovery time in half...lol, I love this trade :-S
    Lol ya, some sparky didn't mark the white on a roof, some idiot (me) didn't check, it was a weird situation.

  13. #13
    Join Date
    Dec 2006
    Location
    In a Mess
    Posts
    1,012
    Quote Originally Posted by coolerik View Post
    ...oh well all billable to thermo fisher under warrenty... lesson learned though bah
    so does that mean they will pay 3 hours labour because that is how long "they" say it takes....

    I don't know thermo Fischer but that is a crack at othere warranty expectations ! hahaha
    Sig removed by mod. G-Rated site

Page 1 of 2 12 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event