Results 1 to 9 of 9

Hybrid View

  1. #1

    needing a little help

    I own a building which has 11 units most are 5 ton 3 phase 208/230 R22 a few are 7.5 ton
    anyway it is a bowling center we don't try to cool the back end was looking on ebay at this unit
    I wondered if it would help me. it is a Liebert MMC065A-YL2 i read the spec sheet but I cant tell if it will run by itself or
    if it needs another airhandler to go with it.
    stiremup
    Attached Images Attached Images  

  2. #2
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    66,824
    Pic is too small to tell.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  3. #3
    Join Date
    Feb 2006
    Location
    Atlanta,GA.
    Posts
    811
    its a mini mate do you get both pieces it should have a outdoor section that goes with it . it is designed for computer / server rooms i think it is 5 tons

  4. #4
    300842934850 ebay there is another one on their store which has no compressor so they tie together this one was on roof supposedly

  5. #5
    Join Date
    Feb 2006
    Location
    Atlanta,GA.
    Posts
    811
    you will need other half, wouldnt really recommend this unit unless you are trying to cool a server room you will also need the controller(tstat) that is for that unit iyt is a special one that is for that liebert

  6. #6
    ok so im probably going to get some abuse but i just found out after 40 yrs of being around it that the dryers on the suction are supposed to be temporary is this new?

  7. #7
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    66,824
    Quote Originally Posted by stiremup View Post
    ok so im probably going to get some abuse but i just found out after 40 yrs of being around it that the dryers on the suction are supposed to be temporary is this new?
    Been that way for as far back as I can remember.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

  8. #8
    Join Date
    Nov 2004
    Location
    Chicago, Illinois
    Posts
    17
    This is the Ask Our Pro's forum, and only Pro members that have been vetted by the AOPC may post advise, commentary, or ask questions of the OP here.

    You can find the rules for posting and qualifications here.

    Further infractions may result in loss of posting privileges.
    Last edited by beenthere; 02-12-2013 at 07:13 PM. Reason: Non Pro * Member

  9. #9
    Join Date
    Jan 2004
    Location
    Lancaster PA
    Posts
    66,824
    ironman597, this is the Ask Our Pro's forum, and only Pro members that have been vetted by the AOPC may post advise, commentary or ask questions of the OP here.

    You can find the rules for posting and qualifications here.

    Your post has been deleted.
    Further infractions may result in loss of posting privileges.
    Contractor locator map

    How-to-apply-for-Professional

    How many times must one fix something before it is fixed?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event