Results 1 to 13 of 26
Thread: Classy
-
01-26-2013, 12:35 AM #1
Classy
[ATTACH]350181[/ATTACH
Who says things were done better 20 years ago?
I think that big loop helps shoot the oil back into the compressor.
-
01-26-2013, 05:35 AM #2
Professional Member
- Join Date
- Jan 2013
- Location
- Henderson, NV
- Posts
- 18
Installer was a big roller coaster fan!
-
01-26-2013, 06:14 AM #3
Professional Member*
- Join Date
- Feb 2006
- Location
- Float'N Vally, MS
- Posts
- 1,622
-
01-26-2013, 06:48 AM #4
Professional Member*
- Join Date
- Apr 2003
- Location
- Maple Grove, MN
- Posts
- 752
I'm coming to the defense of that install. I believe that is a pre-charged line-set. You aren't supposed to cut those. Therefore, any extra line-set that you have needs to be left coiled up in a big mess. That's the way they wanted it back then.
-
01-26-2013, 08:17 AM #5
I've heard tale from the older guys about such things. How did one go about connecting the lineset and releasing the charge?
-
01-26-2013, 08:20 AM #6
It's just a version of an inverted trap!
A really crappy version.
-
01-26-2013, 09:55 AM #7
-
01-26-2013, 10:02 AM #8
Professional Member
- Join Date
- Jan 2011
- Posts
- 675
-
01-26-2013, 10:44 AM #9
-
01-26-2013, 11:12 AM #10
So was there a flared/compression type fitting that held the charge until you tightened the joint? I can't believe those things lasted too long...maybe meant for builder installs?
-
01-26-2013, 12:26 PM #11"Better tell the sandman to stay away, because we're gonna be workin on this one all night."
"Dude, you need more than 2 wires to a condenser to run a 2 stage heatpump."
"Just get it done son."
Dad adjusted
-
01-26-2013, 12:53 PM #12
We used all sorts of precharged line sets, they were all copper, Aeroquip fittings on the ends. We cut them to length, soldered them back together, vacuum pumped them and thighetened them up. Never had a problem.
The only problem with them was the Aeroquip fittings didn't like to seal if you took them apart and tried to put them back together. For some reason it seamed liike half the time they would leak the second time around.
-
01-26-2013, 01:01 PM #13
Professional Member*
- Join Date
- Dec 2002
- Location
- SouthEast NC ICW & Piedmont Foothills
- Posts
- 7,254
oh, you yungins got a lot to see, wait until you cross a lennox that used the liquid line as the metering device and there is an extra 20' of liquid line
at least they followed mfg instruction an d sloped the lines and didn't stand them vertical
yea they could have made it look a tad better (not by much though)
It`s better to be silent and thought the fool; than speak and remove all doubt. 


Reply With Quote

