I know many of you busted my hump about not painting the board on this install....

http://hvac-talk.com/vbb/showthread....-Family-Retail

The pics below are of a new construction home being built by a local inspector.

-all in floor
-garage zone has antifreeze and is separated with plate heat exchanger
-boiler buddy
-alpha pump with zones
-indirect dhw


This is still a work in progress but I thought it looks great so far. The water line to the fill for the boiler was installed as a temporary thing by the plumber as he was in a hurry. I didn't do any of the piping but I designed the boiler board and will be completing wiring and start up probably next week. We also have installed a gas furnace, a/c and duct into this house.


Name:  DSCN0293.jpg
Views: 712
Size:  57.3 KB


Name:  DSCN0295.jpg
Views: 654
Size:  70.5 KB