Anyone ever take out the fill on a BAC closed circuit cooling tower? Don't have the model number, but it's about 8 years old, has upper and lower fill. The fill has 7 or 8 bars which run through it and bolt to the side panels. Not sure how to tackle this job, either does anyone I work with. Anyone been there done that?