Name:  001.jpg
Views: 1361
Size:  40.2 KBName:  002.jpg
Views: 1227
Size:  34.5 KBName:  003.jpg
Views: 1259
Size:  41.9 KB

Knucklehead changed the compressor,stripped the bolts,put out a fire,drilled holes in the basepan and everything else,finaly, used togglebolts and drilled 1/2" holes in basepan. Toggles would'nt hold so he added unistrut. When it rains 20 ceiling tiles fall out above cubicles below. Rebuild or replace, roughly the same cost.