Results 14 to 17 of 17
-
12-21-2012, 09:19 PM #14
well pretty much that certain tech came up as a fitter through 420, but was very good with computers. while coming up he got a hold of a laptop and wala, he became an all around controls tech. the non union controls techs didnt like the idea at first, but he grew on them. he was making a fitter rate pushing buttons and installing boards lol. but dont get me wrong, he did valves, actuators, everything bas has to offer
I dont install leaks, i just fix em
Sig line removed by Admin*
Lets see if this gets removed..............
-
12-21-2012, 09:22 PM #15
so op, how did you make out with the interview?
I dont install leaks, i just fix em
Sig line removed by Admin*
Lets see if this gets removed..............
-
12-26-2012, 10:15 AM #16
-
01-05-2013, 12:15 PM #17
Regular Guest
- Join Date
- Feb 2008
- Location
- suburbs of Philadelphia, PA
- Posts
- 30
I had a good meeting with the guys at Fluidics last month but just got word last night that my second interview next week is cancellled. I can only assume they hired someone for the integrator position. Maybe next tiime!



Reply With Quote