Page 2 of 2 FirstFirst 12
Results 14 to 16 of 16

Thread: 100 ton Carrier

  1. #14
    Join Date
    Aug 2006
    Location
    Columbus Ohio
    Posts
    2,007
    Quote Originally Posted by JKopp View Post
    Snip
    No joke, that looks exactly like an old Carrier I got on a call about 5yrs ago.

    Took me two full days to rewire that POS, turned on the disconnect and took half the power out in the neighborhood. Had two wires crossed up creating a phase to phase short, somehow blew the fuse in a main line transformer out on the street, watched it cook off from the roof. Manager came running up on the roof asking if I was OK, played stupid as if I was still working on the unit and had no idea what happened, they bought it hook, line, and sinker and called the power co. Power co shows up, replaces the fuse while I am still pretending to work, I get my wiring straightened out, fire the pig up, and look like a hero.

    True story.
    UA LU189

    10mm, because it's better than .45acp

  2. #15
    Join Date
    Jan 2006
    Location
    McQueeney, Texas
    Posts
    3,864
    Quote Originally Posted by JKopp View Post
    Maybe this should happen next if they don't take care of the belt.








    LMAO- Now that's just funny right there!!!

  3. #16
    Join Date
    Apr 2012
    Location
    Louisiana
    Posts
    673
    Quote Originally Posted by JKopp View Post
    Maybe this should happen next if they don't take care of the belt.



    Great reason to have a camera so you can justify your time afterwards.

    Loose belt and you billed two days!!!!

    Bust out the pics.

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event