Page 2 of 2 FirstFirst 12
Results 14 to 18 of 18
  1. #14
    Join Date
    Sep 2011
    Location
    Plainfield IL
    Posts
    101
    I agree with dangpgt... I have had great luck with the battery operated tif ZX1 and also love my H10 plug in ...hate the plug in though. As far as using your h10 I was taught to put it on the small leak size then dial it in till you barely hear the tick. If you swipe it in a cooler and it goes off it means there is a leak almost guaranteed.

  2. #15
    Join Date
    Sep 2007
    Location
    State College, PA
    Posts
    886
    Quote Originally Posted by jpsmith1cm View Post
    I want to take a minute to specifically address this statement.

    If you don't stop and take the time, MAKE the time to do what is needed and do it correctly the FIRST time, then you will NEVER have the time to do it correctly.

    Putting a half-a**ed repair on a piece of equipment just to run to another call to slap a band-aid on it to get to the next call....

    Then, what happens is the half-a**ed, band-aided repairs start to unravel and you wind up starting to run call-backs intermixed with normal break downs.

    Now, you've got even LESS time to do what needs done.

    So, what do you do? Make quicker repairs. Use lighter bandaids. Add MORE gas to buy yourself more time until they call back again when it leaked out.

    STOP THE MADNESS!


    Ok, I'm going to step off of my soap box, now and maybe have a beer. I think I need one....

    Heck No JP! Get back on that soap box. Sure wish you could convince my ex-boss of that way of thinking. Read my sig line and that is what I am talking about. Why do all these companies want you to put a band aid on just about every call you run. Do half of what you said you were going to do on the maintenance. Need 2-3 call backs on almost every installation.

    I guess I just don't get it. I must be real dumb or something, thinking that the smartest way to get the work really done is to get it, do it right, make sure it is right, then leave the site.

    I really like the above explanation on how to really care for a rack.

    Thanks!
    Can someone please explain to me -
    Why is there never enough time to do it right the first time, but plenty of time to do it twice?


    Please view site rules: http://hvac-talk.com/vbb/showthread.php?t=1241

    Apply for Pro Membership: http://hvac-talk.com/vbb/showthread.php?t=116113

    Find your local HVAC-Talk Contractor: http://icemeister.net/aop_map.html

  3. #16
    Join Date
    Jan 2010
    Location
    Vancouver Island
    Posts
    90
    All of this is great advice.

    Couple things to add. When we leak check, we try to divide things up so it does not seem so overwhelming. ie....start with low temp rack. Start with one line set at a time. If your low temp racks have hot gas defrost, put the section your are checking into defrost while your are sniffing with your leak detector, as the increased pressures can help your find smaller leaks.

    Patience and persistence is key.

  4. #17
    Join Date
    Sep 2008
    Location
    Western PA
    Posts
    20,971
    Quote Originally Posted by joemach View Post
    Heck No JP! Get back on that soap box. Sure wish you could convince my ex-boss of that way of thinking. Read my sig line and that is what I am talking about. Why do all these companies want you to put a band aid on just about every call you run. Do half of what you said you were going to do on the maintenance. Need 2-3 call backs on almost every installation.

    I guess I just don't get it. I must be real dumb or something, thinking that the smartest way to get the work really done is to get it, do it right, make sure it is right, then leave the site.

    I really like the above explanation on how to really care for a rack.

    Thanks!
    First day, first JOB, I saw a sign with a very similar sentence hanging over the door leading from the back room of a store onto the sales floor.

    "If you don't have time to do it right, when will you find time to do it over?"

  5. #18
    Join Date
    Sep 2007
    Location
    State College, PA
    Posts
    886
    Quote Originally Posted by jpsmith1cm View Post
    First day, first JOB, I saw a sign with a very similar sentence hanging over the door leading from the back room of a store onto the sales floor.

    "If you don't have time to do it right, when will you find time to do it over?"
    ABSOLUTELY !

    Sure wish I could get into rack work. Only been a a few. Seems like they really wanted it done right. Just not much of it around here out in the sticks.
    Can someone please explain to me -
    Why is there never enough time to do it right the first time, but plenty of time to do it twice?


    Please view site rules: http://hvac-talk.com/vbb/showthread.php?t=1241

    Apply for Pro Membership: http://hvac-talk.com/vbb/showthread.php?t=116113

    Find your local HVAC-Talk Contractor: http://icemeister.net/aop_map.html

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •