Originally Posted by
KnewYork
Is this thread in the right forum? The Appion G5 twin may be a good machine, but I don't think I'd be proud of the fact it took 18 hours to recover 4000 lbs. of R-134a like they state in their brochure. Almost two and a half work days, are you kidding me?
You can pump out 4000# of liquid in 1/3 that time. Getting the vapor is what takes all the time. I wouldn't try it with an Appion machine, though. IMO, if you're dealing with something that has 4000# of charge, that's like bringing a squirt gun to a nuclear war.
Don't pick the fly crap out of the pepper.