Results 1 to 2 of 2
  1. #1
    Join Date
    Aug 2008
    Posts
    511

    Niagara reference schedule

    I am trying to reference a schedule in my local jace from a schedule I created in the ax supervisor... When I go to add the reference the selection drop down is empty.. How do I get to show my imported schedules to show in drop down??

  2. #2
    Join Date
    May 2004
    Location
    SE Pennsylvania
    Posts
    917
    By reference do you mean like a holiday schedule? If so the reference needs to be made where the main schedule resides. The schedule will be imported to the JACE with the necessary info.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event