Results 27 to 29 of 29
-
09-18-2012, 08:01 PM #27
Professional Member
- Join Date
- Aug 2012
- Location
- Gainesville, FL
- Posts
- 226
-
09-18-2012, 08:07 PM #28
Professional Member
- Join Date
- Aug 2012
- Location
- Gainesville, FL
- Posts
- 226
I see a good few of these on commercial re-roofs. Here in FL when the CU is moved for a re-roof it goes back on a nice, shiny new aluminum stand that's been engineered, approved, and inspected. Height, bracing, everything prescribed by code. No more patio blocks, 4x4's, etc. A good sized strip mall or office building might have 50+ of these things to disconnect and reinstall on stands.
-
09-18-2012, 08:30 PM #29
I always break the bill out to two invoices. Bill for pumpdown and disconnect. Then bill the other later.
Sent from my ERIS using Tapatalk 2



Reply With Quote