Page 3 of 3 FirstFirst 123
Results 27 to 29 of 29
  1. #27
    Join Date
    Aug 2012
    Location
    Gainesville, FL
    Posts
    325
    Post Likes
    Quote Originally Posted by artdavila View Post
    Beautiful! Pete838, love the legalese! hope this isn't copyrighted.....
    Nope, go fer it. I don't get to turn wrenches nearly as much as I deal with contracts and proposals. Glad I could help.

  2. #28
    Join Date
    Aug 2012
    Location
    Gainesville, FL
    Posts
    325
    Post Likes
    Quote Originally Posted by pcp View Post
    Last company I worked for did these disconnect reconnects for a landscaping company. Never was an issue. Ended up doing quite a few. We also ran a lot of gaslines for outdoor fireplaces and bbq grills.
    I see a good few of these on commercial re-roofs. Here in FL when the CU is moved for a re-roof it goes back on a nice, shiny new aluminum stand that's been engineered, approved, and inspected. Height, bracing, everything prescribed by code. No more patio blocks, 4x4's, etc. A good sized strip mall or office building might have 50+ of these things to disconnect and reinstall on stands.

  3. #29
    Join Date
    Jun 2009
    Location
    Upstate SC
    Posts
    1,439
    Post Likes
    I always break the bill out to two invoices. Bill for pumpdown and disconnect. Then bill the other later.

    Sent from my ERIS using Tapatalk 2

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event