  1. #27
    Join Date
    Jul 2012
    Posts
    22
    I have 3 estimates but I picked the wrong one.
    When I installed the system I had to make a quick decision to
    get AC in the house of medical issues.

    Now I need to look at the issues and correct this problem so I am
    trying to get information. I will probably have to spend more
    money correct these issues but I need some guidance here.

    First is to get these issues together so I can confront the
    current contractor with them. If he I can't get him to correct issues I will
    hire someone else to make corrections.
    If that what it takes I will do that.


    Thank you,

  2. #28
    Join Date
    Apr 2010
    Location
    NC Sandhills
    Posts
    411
    Definitely have a sit down or on site meeting with owner or manager before doing anything drastic. It is usually better resolving things with one contractor than getting 2 contractors on one system.

Page 3 of 3 FirstFirst 123

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event