Results 1 to 4 of 4
  1. #1
    Join Date
    Apr 2006
    Location
    Columbus, Ohio
    Posts
    689

    New Trane RTAC Chiller Installation

    A few weeks ago we changed out a old Carrier Flotronic Chiller to a new Trane RTAC Chiller. We also removed the single split case pump, and installed 2 pumps. We also programmed the control system to control the pumps in a lead lag type control sequence. We had to complete this job in two days. We started on a friday night, and finished by 6 pm on saturday.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	AAA - Carrier Flotronics 7 06E Six Cylinder Reciprocating Compressors.jpg 
Views:	465 
Size:	70.2 KB 
ID:	264371   Click image for larger version. 

Name:	AAA - Flotronic Chiller.jpg 
Views:	456 
Size:	60.3 KB 
ID:	264381   Click image for larger version. 

Name:	AAA - Lowering The Old Chiller Back Down.jpg 
Views:	442 
Size:	57.5 KB 
ID:	264391   Click image for larger version. 

Name:	AAA - Removing The Old Aurora Split Case Chilled Water Pump.jpg 
Views:	463 
Size:	40.7 KB 
ID:	264401   Click image for larger version. 

Name:	AAA - The New Chiller Going Over The Fence.jpg 
Views:	471 
Size:	60.9 KB 
ID:	264411   Click image for larger version. 

Name:	AAA - The New Chilled Water Piping To The Chiller.jpg 
Views:	488 
Size:	54.5 KB 
ID:	264421   Click image for larger version. 

Name:	AAA - The New Chiller In The Air.jpg 
Views:	461 
Size:	56.9 KB 
ID:	264431  

    Click image for larger version. 

Name:	AAA - Installation Of Two New Chilled Water Pumps.jpg 
Views:	492 
Size:	45.4 KB 
ID:	264441  
    J. King

  2. #2
    Join Date
    Sep 2005
    Posts
    137
    Very Nice!

  3. #3
    Join Date
    Mar 2007
    Location
    Home of the newly wed and the nearly dead
    Posts
    2,941
    It looks nice for a two day turnkey replacement. It's obvious that the guys who actually did the work take pride in what they do, but it also looks like you had a low budget property manager at the helm. Those are the places you usually see old carrier recip single chiller/single pump, no redundancy, building full of menopausal women, and no money to do it right the first time! The piping leaves a lot to be desired, IMO... Whoever laid it out has obviously never had to actually work on these things, cause they blocked 50% of the service access. No fault for the field guys who got it done... The people who make these decisions rarely have to deal with the consequences of their oversights. Hopefully that chiller has control of the pumps, as well. Pump control is much more important with that new chiller than it was with the old Carrier DX chiller.

    It's very nice to see pictures of this kind of equipment on the W.O.P. Thank you for posting.
    Last edited by Tech Rob; 05-20-2012 at 11:34 PM.
    Truth is still truth, even if no one believes it. A lie is still a lie, even if everyone believes it.

    "It's called the american dream because you have to be asleep to believe it" -George Carlin

    "A nation of sheep begets a government of wolves" -Edward R. Murrow

    "I have problems just like you. One time, my dancing horse almost fell into my car elevator" -Mitt Romney

    Buy american made goods & support locally owned businesses!

  4. #4
    Join Date
    Jan 2009
    Location
    Not in Iran
    Posts
    906
    Quote Originally Posted by Tech Rob View Post
    It looks nice for a two day turnkey replacement. It's obvious that the guys who actually did the work take pride in what they do, but it also looks like you had a low budget property manager at the helm. Those are the places you usually see old carrier recip single chiller/single pump, no redundancy, building full of menopausal women, and no money to do it right the first time! The piping leaves a lot to be desired, IMO... Whoever laid it out has obviously never had to actually work on these things, cause they blocked 50% of the service access. No fault for the field guys who got it done... The people who make these decisions rarely have to deal with the consequences of their oversights. Hopefully that chiller has control of the pumps, as well. Pump control is much more important with that new chiller than it was with the old Carrier DX chiller.

    It's very nice to see pictures of this kind of equipment on the W.O.P. Thank you for posting.


    That piping is hugging the machine pretty tight ! I agree!
    no signature blast'em man blast'em
    !!!KILL THE TERRORIST!!!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •